From design to complete construction of the AI Factory.
From equipment installation to a fully operational facility.
A single 1.5 MW deployment group — compute, CDU cooling, power, and UPS packaged together for high-density liquid-cooled servers.
A modular 1 MW scheme — two compute containers with shared power distribution and UPS for flexible capacity planning.
Prefabricated modular container-room solutions for high-density NVIDIA B300 server deployments, co-developed with global partners.
A two-container modular design that creates dense inference capacity with manageable power and thermal requirements.